GlossaryMaintenance

What is a work order?

Abbreviated as WO. Also known as: WO, maintenance work order, work order number, job card.

Definition

A work order is a record that authorizes a maintenance job and tracks it: what to do, on which asset, who does it, by when, and what it cost.

4 min readMaintenanceExplore Asetavo maintenance →
Work order in use

A work order (WO) is a document, paper or digital, that authorizes a specific job and tracks it from request to completion. In maintenance it tells a technician what to do, on which asset and by when, and it records what was actually done, the time and parts used and the cost. Every closed work order becomes part of the asset's service history.

Other words for a work order include job card, job ticket, job order, service order, maintenance ticket and work ticket. A work request is related but different: it is the first report ("the boiler is making a knocking noise") that a planner approves and turns into a work order.

Types of work order

TypeTriggered byExample
PreventiveA maintenance schedule coming dueQuarterly HVAC filter change
CorrectiveA fault or breakdownReplace a failed pump seal
InspectionA planned check of condition or safetyMonthly fire-extinguisher check
CalibrationAn instrument’s calibration due dateAnnual pressure-gauge calibration
EmergencyA failure that is a safety risk or stops operationsBurst pipe above a server room
Project / improvementA planned change or installationFit a new guard to a production line

Preventive work orders come from the maintenance schedule; corrective ones come from faults. Keep the list short, because reports split cost and time by type.

What a work order contains

FieldExample
Work order numberWO-03317
Asset and locationConveyor 2B, Line 2, Plant A
Type and priorityCorrective, high
Description and task listGrinding noise at drive end; inspect and replace bearing
Requested by / assigned toLine supervisor / maintenance technician
DatesRequested, scheduled, started, completed
StatusOpen, assigned, in progress, on hold, completed, cancelled
Labour and parts1.5 h; bearing 6205 ×1
Cost and downtimeParts plus labour total; 95 minutes out of service
Findings and follow-upShaft wear noted; follow-up inspection in 30 days

What is a work order number?

A work order number is the unique reference for one job. It links invoices, parts and downtime records to the work. A good number is sequential, never reused and short enough to read out over the phone.

Example numbering schemes
Simple sequence: WO-00001, WO-00002, WO-00003 and so on.
With site and year: PLTA-2026-0412 (site, year, sequence within the year).
Keep changeable meaning such as type or priority out of the number.

The work order lifecycle

  1. Request. Someone reports a fault, or a schedule comes due.
  2. Approve and plan. A planner rejects duplicates, sets type and priority, and lists tasks and parts.
  3. Schedule and assign. The job gets a date and a technician or outside vendor.
  4. Execute. The technician does the work and records findings. A job waiting for parts goes on hold.
  5. Complete. Time, parts, cost and downtime are recorded, and the requester is told.
  6. Review. Patterns across closed work orders drive MTTR, MTBF and repair-or-replace decisions.

Work order examples by industry

  • Hospital: a bed with a faulty brake gets a corrective work order and is tagged out of use.
  • School: a teacher reports a projector fault; facilities raise a work order and a contractor replaces the lamp.
  • Logistics: each forklift's 250-hour service is a preventive work order, building cost per truck.
  • Hotel: a guest-room air-conditioning fault is logged against that unit, not just the room.

Common mistakes

  • Doing small jobs without a work order. They add up, and the asset history is incomplete.
  • Vague descriptions such as "fix machine". Name the symptom and the asset.
  • Leaving jobs in progress for weeks. Use on hold with a reason, so the backlog is honest.
  • Logging against the wrong asset. Scan the asset's tag rather than picking from a long list.

Spreadsheet vs CMMS

Many teams start with a spreadsheet or a shared inbox: one row per job, with a number typed by hand. It breaks when two people add the same number, statuses go stale, and finance asks what one machine cost this year. A CMMS numbers jobs automatically, enforces the status flow and builds each asset's history as jobs close.

Work orders in Asetavo

In Asetavo maintenance (Business plan), work orders are auto-numbered (WO-00001), typed as corrective, preventive, inspection or calibration, and given a priority from low to urgent. They move through Open, Assigned, In progress, On hold and Completed (or Cancelled) on a board or a list, with start and completion times stamped by the server. Each records the technician, requester, any vendor, parts and labour cost and downtime minutes, and lands on the asset's Maintenance tab. Preventive work orders are raised by a planner from the Due & overdue list.

FAQ

Common questions about work order

A work order is a record that authorizes a job and tracks it to completion: the asset, the task, who does it and when it is due, then what was done, with time, parts and cost. In maintenance, closed work orders form each asset’s service history.
From definition to done

Put work order to work with Asetavo

One platform for the asset register, QR/barcode/NFC/UHF RFID tagging, zones and alerts, audits, maintenance and depreciation. Start free on Starter — no card required.

Ready to account for every asset?

Tag, track and audit everything you own — from a handheld scanner to a boardroom report.

No card required · Workspace ready in minutes · Simple USD pricing