Scope
Results
Differences and actions
| Asset ID | Description | Result | Investigation | Proposed action | Approved by |
|---|---|---|---|---|---|
Verification certificate
We confirm that a physical verification of the fixed assets in the scope above was carried out by the team named in the attached report, that every asset on the register as at the cut-off date was checked, and that the results below are a fair record of what was found. Differences have been investigated and the actions listed in the report have been proposed for approval.
